  1. Initial Client Meeting
  2. Introduce products and discuss options
  3. Blue prints and design layout
  4. Lighting layout (upon request or spec)
  5. Customer approval and sign off
  6. Site preparation & walk through
  7. Pre-wire (all low-voltage wiring)
  8. Post pre-wire (digital pictures & video taping)
  9. Periodic job checks before trim out
  10. Trim out of home electronics network
  11. Programming and testing of installed systems
  12. Customer training & satisfaction survey
  13. Post install follow-up
 